
Terminal Costs
The above graph represents a simplified assumption concerning transport costs for three modes. It should be noticed that the cost curves all begin at some point up the cost axis. This represents terminal costs, and as can be seen, shipping (T3) and rail (T2) start with a significant disadvantage compared to road (T1).